Audit the preform, mould and oven scope of a used PET blower

Prepare a PET blower inspection sheet covering included moulds, preforms, oven configuration, utilities and package evidence.

A used PET blow moulding machine should be evaluated with the package and tooling it is intended to run. The machine model, included moulds and production evidence all matter. Prepare an audit sheet that separates the physical equipment being sold from the proposed bottle project. This gives technical reviewers a clear basis for assessing compatibility, condition and any additional work before a purchase.

01

Reconcile the included mould inventory

Ask for a list and photographs of the offered moulds and associated components. Link each set to the bottle drawing and the machine reference. Record whether moulds are installed, stored separately or excluded from the offer. Do not infer that every bottle shown in historical marketing material has a corresponding mould set included in the transaction.

02

Identify the preform and oven configuration

Obtain the preform drawings used for the demonstrated bottle and identify the proposed alternatives. Record the available documentation for preform handling and the oven configuration. During an agreed inspection, ask the responsible technician to describe visible wear, maintenance records and replaced components. Keep observations separate from predictions about a new preform or bottle that has not been assessed.

03

Check services against machine documentation

Request the specified electrical, compressed-air and cooling requirements for the exact machine. Identify which compressors, treatment equipment, cooling units and connections are included. Ask for operating records where available, preserving their original units and conditions. Avoid deriving utility demand from cavity count or advertised output alone, especially when the proposed bottle differs from the one used to produce the quoted data.

04

Tie a bottle trial to its settings

Record the tested preform, mould, package drawing, machine settings and operating conditions. Ask which bottle checks were performed and retain the corresponding results with their sample identification. List further assessment needed for any proposed conversion. The completed audit should show included tooling, verified evidence and unresolved items independently, helping the buyer obtain a specific engineering review instead of a generic assurance of flexibility.

Buying checklist

  • List each mould set and its linked bottle drawing.
  • Record the actual preform and oven configuration.
  • Separate supplied utilities from destination equipment.
  • Keep trial samples and results tied to their settings.