A specialist marketplace by BottlingScoutBottlingScout.com ↗

BottlingScout knowledge

Inspect moulds and oven configuration

preforms, moulds, ovens and high-pressure air · international PET equipment market

Use preform and bottle requirements to compare blow-moulding equipment. Check the available moulds, oven configuration and site utility information before arranging inspection.

01

Inspect moulds and oven configuration

Match supplied moulds to the equipment list and record the format used for any demonstration. Request available maintenance and utility information. Review the condition of heating and handling components with a competent technician before drawing conclusions about the project.

02

Verify identity and scope

Match serial plates, year, manuals, electrical drawings and the seller’s equipment list to every module offered.

03

Inspect condition

Check wear parts, lubrication, bearings, product-contact areas, safety systems, controls, obsolescence and visible modifications.

04

Test with evidence

Whenever possible run the equipment with representative product and formats, recording speed, rejects, alarms and changeover requirements.

WhatsApp